Panmure to Pakuranga Busway

Share on

GHL’s Construction Barriers line the streets of Panmure

The Panmure to Pakuranga stage of The Eastern Busway includes a new busway along the north side of Lagoon Drive and upgrading the Panmure roundabout. Initial works have involved replacing the Panmure roundabout at Lagoon Drive with a signalised intersection. Works are due to continue along Lagoon Drive with a new bridge planned across the Tamaki River with shared paths for cyclists and pedestrians.

 

Working alongside Fulton Hogan, GHL TempFence have supplied over 500m of 1.25h Construction Barriers to direct traffic, control pedestrians and keep workers safe while onsite.

 

With Infrastructure & Civil sites often being extremely busy the Panmure to Pakuranga Busway is no exception. With traffic flow and pedestrian safety a high priority, GHL’s Construction Barriers are specifically designed to isolate hazards while having the smallest footprint possible. With highly visible orange mesh and specifically designed steel feet, GHL’s Construction Barriers are extremely stable while eliminating trip hazards for both workers and the public.

 

With over ten years’ experience and km’s of Temporary Fencing equipment in stock GHL TempFence can provide the perfect solution for your next project.

Call us now on 0800TempFence or visit www.GHLTempFence.co.nz

Click here for more information on Temp Fence Hire
Click here for more information on Temp Fence Sales